Full Log Wall Construction
|
Post and Beam... |
Delivery and Assembly On Your Site
When the final sanding and clean up of the structure is complete, each log is tagged before dismantling and loading
onto trailers or containers ready for transportation.
After your contractor completes the foundation and main floor system on your site,
your log package will arrive, accompanied by at least one Log Connection specialist
who will advise and assist in the re-assembly.
|
Pre Delivery Services:
|
Delivery Advisor:
Every Log Connection home includes on site technical assistance for the re-assembly of the
log package. Advisor will assist with:
|
![]() |
Log Shell Set-Up Time-Lapse Video
![]() |
This one-minute time-lapse video of a recent log home setup was recorded over a period of two days.
Watch the stacking of the log walls, the placing of the upper floor log beams, the upper floor
log posts, and finally the roof beams.
|
Click the link for the video size and type of your choice
(will open in a new window):
|